Home

Product Guide


Ice Series

Inline Series

Soccer Series

Rink Dividers

Vertical Lift Gate

Accessories

Protective Netting

Other Products

Testimonials

Our Competition

Photo Tour

Project Lists

Project Links

About Us


Advantages

Why Aluminum

Team SSU

News

Links

Contact Us

Distributors and Representatives



Setting Up (page 4 of 6)




Start at one end, usually at the machine gate and install the boards down both sides at the same time, with two sets of two people. This operation takes 4 people.



Install the glass (The glass handling suction cup device is optional). This operation takes 3 people.

Follow The Tour

Contact Sport Systems

Phototour Quick Links


Dasher Boards | Product Guide | Ice Series | Inline Series | Soccer Series

Rink Dividers | Vertical Lift Gates | Accessories | Testimonials

Our Competition | Photo Tour

About Us | Contact Us

Copyright© Sport Systems Unlimited Corp. 2005-2008